PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling inside Stair -2 Facing West (800x600).jpg Installing rebar mats at Elev. 4 (4th Floor) Facing South (800x600).jpg Conduit at Elev. 1,2,3 Facing East (800x600).jpg Constructing shear wall panels for Stair -4 (3rd Floor) Facing North-East (800x600).jpg Constructing the shear wall panels for Stair -4 (3rd Floor) Facing North-East (800x600).jpg Electrical pipes running to the Electrical Room (152) Facing South-East (800x600).jpg
Previous pageNext page Installing rebar mats at Elev. 4 (4th Floor) Facing South (800x600)
Installing rebar mats at Elev. 4 (4th Floor) Facing South (800x600)